A17.1-2016 : Elevators
|
2.11 - Disconnecting Means and Control
|
3.26.1
|
No
|
No
|
1 DiscDue to the addition of sprinkler heads in the elevator machine room a heat detector is required within 24 inches of every head in the machine room to activate the shunt trip and tested
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
2.1 - Access to machine space
|
2.7.1.1
|
No
|
No
|
All penetrations in the machine room shall be sealed to maintain the fire-resistive construction.
|
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
Yes
|
No
|
Emergency power testing needs to be performed. Re-inspection required
|
4/9/2026
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
2.27.2
|
Yes
|
No
|
The emergency power operation has not been permanently completed. The elevator is on a temporary generator system that does not allow all elevators to operate as designed. The permanent generator system shall be completed and the operation shall conform to this section. Reinspection is required.
|
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
3.26.10
|
Yes
|
No
|
The auxiliary lowering system has not been permanently completed. This system shall be made operational and a reinspection is required.
|
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
No
|
Emergency power generator to be tested when lobby panel is completed, providing selector switch
|
8/12/2024
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
3.1
|
Yes
|
No
|
Seal hoistway penetrations and non factory seams in core board
|
8/12/2024
|
|
A17.1-2016 : Elevators
|
3.13 - Windows, projections, recesses, and setbacks
|
2.1.5
|
Yes
|
No
|
All beveled surfaces shall be 70 degree bevel and capable of withstanding a 100# per soft load at right angle
|
8/12/2024
|
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
3.27
|
Yes
|
Yes
|
Due to the addition of sprinkler heads in the elevator pit a smoke detector shall be installed in the elevator pit and recall tested.
|
8/26/2024
|