A17.1-2016 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
Add GFCI outlet at top of hoistway.
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Fill 6" gap at the top landing in hoistway and clean down hoistway.
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Fire caulk holes, gaps under sills, & around all beams in hoistway.
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
2.8 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
Heat detector shall be within 24" of sprinkler head.
|
10/11/2024
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
x
|
|
Maximum hoisting capacity needs to be listed on hoisting beam.
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.4
|
x
|
|
Pit ladder is 42" & needs to be 48" above the sill.
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
Plug holes in electrical boxes at the top of hoistway.
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
Relocate heat and smoke detectors from hoisting beam in hoistway to the ceiling of the hoistway.
|
10/11/2024
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6 General Maintenance Methods
|
|
|
The battery back–up rescue device was tested and did not operate as designed, the elevator failed to pick the brake as required.. Repair the device to operate as it is designed. Reinspection required.
|
3/10/2026
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.5
|
x
|
|
The pit light shall be operational.
|
10/11/2024
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
The sump pump is not wired.
|
10/11/2024
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
The testing has not been completed on the elevator at this time. The emergency power operation and fireman’s service operation shall be tested before the inspection is completed.
|
3/10/2026
|
|
A17.1-2016 : Elevators
|
2.3 - Lighting and receptacles
|
2.7.9.1
|
x
|
|
There is not enough light in control space.
|
10/11/2024
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
Vent needs to be more than 36" from heat & smoke detector at top landing.
|
10/11/2024
|