A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.2 On-Site Documentation
|
x
|
|
A code compliant MCP and all the on-site documentation required shall be provided in the machine room.
|
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.10 Acceptance Inspection and Test
|
x
|
|
All phases of fire service has to be checked including smokes, heat, and flow valve.
|
|
|
A17.1-2016 : Elevators
|
2.7 - Fire Extinguisher
|
8.6.1.6.5
|
x
|
|
An ABC fire extinguisher with a current test tag shall be mounted in the machine room located convenient to the access door.
|
|
|
A17.1-2016 : Elevators
|
5.2 - Bottom clearance, runby, and minimum refuge space
|
8.6.4.11 Runby (Re-Inspect)
|
x
|
|
Counterweight runby shall be a min of 6" and a max of 7".
|
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.10 Acceptance Inspection and Test
|
x
|
|
Emergency generator test shall be performed.
|
|
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
8.6.4.15 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Emergency phone shall work.
|
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Verify sump pump is code compliant for a shared hoistway. Code requires the sump pump shall be able to discharge 3000 gallons per hour per elevator.
|
|