Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing 8.10 Acceptance Inspection and Test x Final acceptance testing to be completed when elevator in 90 days when elevator is no longer allowed to be on temporary construction use permit 7/30/2024