Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
A17.1-2016 : Elevators 3.10 - Hoistway construction 2.1 x 2.1.1.1 - Fire caulk/fill holes and voids in the hoistway walls, as marked with orange paint. 3/13/2026
A17.1-2016 : Elevators 5.1 - Pit access, lighting, stop switch, and condition 2.2.2.5 Sump Pump Required/Capacity (Re-Inspect) x Sump pump shall have the capacity to remove a minimum of 11.4 m3/h (3,000 gal/h) per elevator. 3/13/2026
A17.1-2016 : Elevators 5.1 - Pit access, lighting, stop switch, and condition 2.2.2.6 Sump Pump Covers x Sump Pump cover shall have the capacity to flow a minimum of 11.4 m3/h (3,000 gal/h) per elevator to sump pump, be able to support worker weight and be substantially flush to the pit floor as not to create a tripping hazard . 3/13/2026