|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
Yes
|
No
|
Fire caulk around sheet rock and beams contact point.
|
2/12/2025
|
|
A17.1-2016 : Elevators
|
3.13 - Windows, projections, recesses, and setbacks
|
2.1.6
|
Yes
|
No
|
Bevel ledges greater than 4 inches.
|
2/12/2025
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.3.2
|
Yes
|
No
|
Counterweight guard does not cover full area of counterweight.
|
2/12/2025
|
|
A17.1-2016 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
Yes
|
No
|
Install all hoistway covers.
|
2/12/2025
|
|
A17.1-2016 : Elevators
|
2.3 - Lighting and receptacles
|
2.8.2
|
Yes
|
No
|
19ft candles required on floor in front of controller.
|
2/12/2025
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.11.3.1.1(q)
|
Yes
|
No
|
Elevators that are equipped to operate on Emergency Power shall be tested operating on Em Power, Annually.
|
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
Yes
|
No
|
Operation of the elevator while operating on emergency generator power shall be tested.
|
2/12/2025
|