A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
8.6.4.15 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Two-way communication system shall work.
|
3/31/2025
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
Top of hoistway smoke and heat detector shall be relocated at or above sprinkler height and not more than 11" from ceiling, heat not more than 24" from sprinkler. All to be NFPA 72 & 13 compliant.
|
3/31/2025
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
Electrical room smoke and heat detector shall not initiate recall operations of the elevator.
|
3/31/2025
|
A17.1-2016 : Elevators
|
2.11 - Disconnecting Means and Control
|
2.26.4.1
|
x
|
|
Cab lighting disconnect shall be of fused type disconnect.
|
3/31/2025
|
A17.1-2016 : Elevators
|
2.3 - Lighting and receptacles
|
2.7.9.1
|
x
|
|
Machine space lighting shall be at least 19fc and not motion activated.
|
3/31/2025
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Hoistway smoke penetrations shall be fire caulked.
|
3/31/2025
|
A17.1-2016 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
Top of hoistway outlet shall be GFCI type.
|
3/31/2025
|
A17.1-2016 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
3.8
|
x
|
|
Two 4x4 box covers are missing.
|
3/31/2025
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.5
|
x
|
|
Pit lighting shall be at least 10fc.
|
3/31/2025
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
2.27.3.2 Phase I Operation Recall by Initiating Device
|
x
|
x
|
1st floor smoke detector shall be located at 1st floor ceiling height. It is currently at 2nd floor ceiling (open air entrance).
|
3/31/2025
|