Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
A17.1-2016 : Elevators 2.8 - Pipes, wiring, and ducts 2.8.2 Yes No 2.8.2.1 Installation of electrical equipment and wiring shall conform to NFPA 70 or CSA C22.1, whichever is applicable (see Part 9). 3 PHASE WIRING SHALL BE PIPED INTO CONTROLLER. NO GREENFILED FLEX OVER 6FT IN LENGHTH. (BATTERY BACKUP WIRING AT TOP OF HOISTWAY, CONTROLLER 3 PHASE POWER WIRING, MISC FLEX IN TOP OF HOISTWAY.) 10/2/2025
A17.1-2016 : Elevators 3.11 - Hoistway smoke control 2.1.4 Yes No 2.1.4 Control of Smoke and Hot Gases When required by the building code, hoistways shall be provided with means to prevent the accumulation of smoke and hot gases. FIRE CAULKING & COVERING OF WOOD IN HOISTWAY, SEALING PENETRATIONS. 10/2/2025
A17.1-2016 : Elevators 5.1 - Pit access, lighting, stop switch, and condition 2.2.2.6 Sump Pump Covers Yes No 2.2.2.6 Sumps and sump pumps in pits, where provided, shall be covered. The cover shall be secured and level with the pit floor. 10/2/2025