Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
Missouri Minimum : Platform Lifts (U) - Existing Vertical and Inclined Platform Lifts (U)1 (Re-Inspect) x Lift shutdown during the inspection, repair lift and schedule reinspection
Missouri Minimum : Platform Lifts CSR 40-5.100 State Operating Certificate 5.100(2) display of certificate Post current copy of the state operating certificate in the machine room 9/28/2023
Missouri Minimum : Platform Lifts CSR 40-5.100 State Operating Certificate 5.100(2) display of certificate The building shall post the operating certificate in the elevator equipment room, and it needs to be updated with a new copy every year. 9/28/2023
Missouri Minimum : Platform Lifts CSR 40-5.100 State Operating Certificate 5.100(2) display of certificate The building shall post the operating certificate in the elevator equipment room, and it needs to be updated with a new copy annually. the certificate on display is from 2018