A17.1-2016 : Elevators
|
2.8 - Pipes, wiring, and ducts
|
2.8.3
|
x
|
|
2.8.3.3.2 - Machine space heat detector activated but failed to trip shunt.
|
8/21/2025
|
|
A17.1-2016 : Elevators
|
3.34 - Earthquake Inspection and Tests (Seismic Risk Zone 2 or Greater)
|
8.6.4.19.17 Earthquake Operation
|
x
|
|
Determine if unit is requires Earthquake Detections ("Ring & String") based on Fp>0.5Wp and Zone 3 requirements. If not required, wiring diagrams/power data sheet shall be updated and data provided to inspector. If required, install detections and reinspect. Unit is located in Seismic Zone D, Importance 1.
|
8/21/2025
|
|
A17.1-2016 : Elevators
|
2.7 - Fire Extinguisher
|
8.6.1.6.5
|
x
|
|
Install large "Fire Extinguisher" signage to direct to fire extinguisher around corner of machine space on second floor.
|
8/21/2025
|
|
A17.1-2016 : Elevators
|
2.11 - Disconnecting Means and Control
|
n/a
|
x
|
|
Main line disconnect (480 volt) obstructed. Must have a minimum of 48" clearance to front of disconnect. Relocate without obstructing lighting disconnect. See also NEC 110.26.
|
8/21/2025
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.5
|
x
|
|
Pit lighting shall not be less than 10fc at the pit floor.
|
8/21/2025
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.6.4.7 Cleaning of Pits
|
x
|
|
Remove and or relocate "Oil Tector" control box from pit area.
|
8/21/2025
|
|
A17.1-2016 : Elevators
|
1.15 - sign and operating device symbols
|
8.6.1.6.7
|
x
|
|
Replace missing "Do not use elevator in case of fire" signage on multiple floors.
|
8/21/2025
|