A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Pit sump pump is required and shall have the capacity to remove a minimum of 11.4 m3/h (3,000 gal/h) per elevator (allowing for head pressure resluting from discharge piping height). Pump currently installed is ZoellerM53 = 2,600 gal/h)
|
12/2/2025
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Pit sump pump discharge piping not connected to building plumbing, discharges onto the floor of room next to hoistway.
|
12/2/2025
|