A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
x
|
|
Pit Sump Pump is required and shall have the capacity to remove a minimum of 11.4 m3/h (3,000 gal/h) per elevator (allowing for head pressure resulting from discharge piping height of 19ft).
|
2/23/2026
|
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
x
|
|
levators that are equipped to operate on Emergency Power shall be tested operating on Em Power.
|
2/23/2026
|
|
A17.1-2016 : Elevators
|
6.1 - Operation of elevators under fire and other emergency conditions (A17.1b-1973 through A17.1b-1980)
|
8.6.11.1 Firefighters’ Emergency Operation
|
x
|
|
1st floor smoke detector installed at less than 36" of HVAC register.
|
2/23/2026
|
|
A17.1-2016 : Elevators
|
6.1 - Operation of elevators under fire and other emergency conditions (A17.1b-1973 through A17.1b-1980)
|
8.6.11.1 Firefighters’ Emergency Operation
|
x
|
|
2nd floor Heat detectors shall trigger Shunt Trip Breaker.
|
2/23/2026
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
8.7.2.1.1 Hoistway Enclosure Walls
|
x
|
|
Fire caulk/fill holes and voids in Hoistway walls, as marked with Orange Paint.
|
2/23/2026
|