MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
Yes
|
No
|
Testing incomplete: ALL CAT5 weight tests (Test GOV pullout/pullthru, Spin GOV, safeties, UM up and Down, 125%, and 100% safety set, slide, etc.).
|
|
|
A17.1-2016 : Elevators
|
2.10 - Numbering of Elevators, Machines, Controllers, and Disconnect Switches
|
8.10.2.2.2(o)
|
Yes
|
No
|
Mainline and Lighting disconnect shall be labeled with Elevator number, location of feeder breakers, and function
|
|
|
A17.1-2016 : Elevators
|
2.11 - Disconnecting Means and Control
|
8.10.2.2.2(r)
|
Yes
|
No
|
Lighting Disconnect shall be fused at 15A(currently 20A) and the neutral shall not be fused.
|
|
|
A17.1-2016 : Elevators
|
2.16 - Overhead Beam and Fastenings
|
8.10.2.2.2(u)
|
Yes
|
No
|
Top of Hoistway Beam shall have capacity labeling.
|
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
Yes
|
No
|
Fire caulk/fill holes and voids in Hoistway walls, as marked with Orange Paint.
|
|
|
A17.1-2016 : Elevators
|
4.2 - Hoistway doors
|
8.6.4.13 Door Systems
|
Yes
|
No
|
Install missing "Car 1" and "Star of Life" signage on each door frame.
|
|
|
A17.1-2016 : Elevators
|
4.2 - Hoistway doors
|
8.6.4.13 Door Systems
|
Yes
|
No
|
Replace missing "Do not use elevator in case of fire" Signage on multiple floors.
|
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.2.5 Sump Pump Required/Capacity (Re-Inspect)
|
Yes
|
No
|
Pit Sump Pump is required and shall have the capacity to remove a minimum of 11.4 m3/h (3,000 gal/h) per elevator (allowing for head pressure resulting from discharge piping height(5ft)
|
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 Maintenance, Repair and Replacements
|
Yes
|
No
|
Relocation 4th Floor Smoke Detector, cannot be within 36" of HVAC venting.
|
|