Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A18.1-2014 : Platform Lifts & Stairway Chairlifts 10.1 Routine, Periodic, and Acceptance Inspections and Test General Requirements 10.1.3 Acceptance Inspections and Tests x Temporary wood railing by atrium must be replaced with permannet railing.
ASME A18.1-2014 : Platform Lifts & Stairway Chairlifts 10.1 Routine, Periodic, and Acceptance Inspections and Test General Requirements 10.1.3 Acceptance Inspections and Tests x Shall install a plate to bridge the gap between the concrete floor and the top landing of the unit.