|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
8.7.2.1.1 Hoistway Enclosure Walls
|
Yes
|
No
|
Fire caulk/fill holes and voids in Hoistway walls, as marked with Orange Paint.
|
7/23/2026
|
|
A17.1-2016 : Elevators
|
2.10 - Numbering of Elevators, Machines, Controllers, and Disconnect Switches
|
8.10.2.2.2(o)
|
Yes
|
No
|
Lighting and Mainline breakers, in 4th Floor Elevator Testing Panel, shall be labeled with location of feeder breakers, and function
|
7/23/2026
|
|
A17.1-2016 : Elevators
|
2.10 - Numbering of Elevators, Machines, Controllers, and Disconnect Switches
|
8.10.2.2.2(o)
|
Yes
|
No
|
Lighting and Mainline disconnects, in Electrical Closet, shall be labeled with location of feeder breakers, and function
|
7/23/2026
|
|
A17.1-2016 : Elevators
|
2.3 - Lighting and receptacles
|
2.7.9.1
|
Yes
|
No
|
Lighting shall not be less than 200lux/19fc at floor in front of controller.
|
7/23/2026
|