A17.1-2016 : Elevators
|
3.12 - Pipes, wiring, and ducts
|
2.8
|
x
|
|
Top of Hoistway overhead water pipe to be removed. Water piping is not used in conjunction with the operation of the elevator. If Sprinkler is added, must conform to NFPA 13 as well.
|
2/27/2026
|
|
A17.1-2016 : Elevators
|
2.8 - Pipes, wiring, and ducts
|
2.8.3
|
x
|
|
2.8.3.3.2(b) - 2nd Floor Machine Space has 2 sprinklers, requiring 2 heat detectors for proper activation of Shunt.
|
2/27/2026
|
|
A17.1-2016 : Elevators
|
2.11 - Disconnecting Means and Control
|
8.10.2.2.2(r)
|
x
|
|
Lighting Disconnect shall be fused at 15amp, currently fused at 20amp.
|
2/27/2026
|
|
A17.1-2016 : Elevators
|
2.7 - Fire Extinguisher
|
8.6.1.6.5
|
x
|
|
2nd Floor Machine Space shall have proper Fire Extinguisher and shall have current monthly/annual test tag.
|
2/27/2026
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
8.7.2.1.1 Hoistway Enclosure Walls
|
x
|
|
Fire caulk/fill holes and voids in Hoistway walls, as marked with Orange Paint.
|
2/27/2026
|