ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.17 - Standby power operation
|
8.11.2.1.1(q)
|
x
|
|
Emergency power is existing but was not tested.
|
8/23/2021
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.42 Seismic (Earthquake protection)
|
8.4.10
|
|
|
Seismic switch not working (ring and string)
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.42 - Earthquake Inspection and Tests (Seismic Risk Zone 2 or Greater)
|
8.4.10 Emegency Operation and Signaling Devices
|
x
|
|
RING AND STRING NOT WORKING, STILL
|
8/11/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
4.12 - Standby power selection switch
|
8.11.2.2.7
|
|
|
Standby power selector switch not working.
|
12/29/2022
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection)
|
x
|
|
Lobby recall devices (smokes) recall elevator to incorrect landing.
|
4/29/2022
|
MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)2
|
|
|
Access to machine room shall be restricted to authorized personnel. Lock missing.
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(1) Minimum Standard
|
x
|
|
Emergency power is existing but was not tested.
|
6/26/2020
|
MO Minimum : Elevators
|
(S) - Fire Service
|
(S)1
|
x
|
|
Doors will not open on Firefighters' Service Phase I recall.
|
6/26/2020
|
MO Minimum : Elevators
|
(S) - Fire Service
|
(S)1
|
x
|
|
Elevator will not go to primary (main) level on Firefighters' Service Phase I recall. Goes to Floor 3.
|
6/26/2020
|