MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
I(1)/106.1 Pit shall be kept dry. Remove rust from pit channels, repaint, repair water leak.
|
12/4/2020
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
I(1)/106.1 Pit shall be kept dry. Remove rust from pit channels, repaint, repair water leak.
|
12/4/2020
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)8
|
|
|
I(8) Pit sump cover to cover hole completely. (REINSPECTION WITHIN 30 DAYS)
|
12/4/2020
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)8
|
|
|
I(8) Pit sump cover to cover hole completely. (REINSPECTION WITHIN 30 DAYS)
|
12/4/2020
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Pit scavenger pump will be removed. (REINSPECTION within 30 days)
|
12/4/2020
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Pit scavenger pump will be removed. (REINSPECTION within 30 days)
|
12/4/2020
|