MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)2
|
|
|
Remove all non elevator equipment from machine room
|
9/16/2020
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
Remove water from pit
|
9/16/2020
|
A17.1-1996 : Elevators
|
2.4 - Machine space
|
100.3d
|
|
|
Remove all non elevator storage from machine room
|
9/16/2020
|
A17.1-1996 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
102
|
x
|
|
Remove water rom pit
|
6/3/2020
|
A17.1-1996 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
1206.2a (Pits and Hoistways)
|
|
|
Clean pit to remove debris, water and/or oil and address sources
|
12/7/2022
|
A17.1-1996 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Up to date Operating Certificate is required in the machine room.
|
7/11/2023
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Post current State certificate in machine room
|
9/16/2020
|
A17.1-1996 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Post urrnt State certiicate in machine room
|
9/16/2020
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
|
|
Provide a maintenance control program on site and on controller
|
9/16/2020
|
A17.1-2016 : Elevators
|
5.15.2 Unsealed Overspeed Valve
|
8.6.5.16.5 (Re-Inspect)
|
x
|
|
Overspeed valve needs to be full load tested in 90 days or less. By 10/18/2021
|
2/13/2023
|
conversion
|
conversion
|
n/a
|
|
|
Sump pump shallbe operational. There is water in the pit
|
9/16/2020
|