A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1002.2g (Standby Power Operation)
|
x
|
|
Emergency return unit failed, and shall,be repaired or replaced. Reinspection required.
|
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspect)
|
x
|
|
Perform the OSV tests no later than 90 days. Re-inspection required
|
8/19/2022
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.2.1 Repair Parts
|
|
|
Auxiliary power lowering device does not work. Repair
|
|