Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements 8.6.1.4 Maintenance records Provide a code compliant MCP including onsite documents. 6/1/2021
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing (3) Testing Procedures (Re-Inspect) x This unit is equipped with a plunger gripper that is due for a full load test. A category 5 test shall be performed in 2021. 5/11/2021