MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Elevator placed in Inactive status, testing could not be completed at this time. Inactive status is only alllowed for 2 years at which time the elevator shall be returned to service or decommissioned according to the state of MO requirements. A Cat 5 test shall be performed before the elevator can be returned to service. Re-inspection required
|
|
|
conversion
|
conversion
|
conversion - reinspect
|
x
|
|
Phone in elevator cab does not work
|
6/7/2019
|
|
MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)5 (Machine Room Lighting)
|
|
|
Repair machine room lighting.
|
7/8/2019
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Unit appears to have emergency generator power, which needs to be tested and witnessed by an inspector to complete the inspection. Re-inspection required
|
3/3/2026
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Unit appears to have emergency generator power, which needs to be tested and witnessed by an inspector to complete the inspection. Re-inspection required
|
|