MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
A written record shall be kept of the quantity of hydraulic fluid added to the system and emptied from leakage collection containers and pans. Note: Per the state of Missouri: The use of oil recovery systems to return the hydraulic fluid back into the main reservoir by automatic means or by gravity feed prevents proper monitoring of the gland packing and seals. Machine rooms cannot be used as containment areas.
|
5/3/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an overspeed valve. A category 5 test is due in 2024.
|
5/3/2024
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022)
|
8/3/2021
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.5.7 Record of Oil Usage
|
|
|
A written record shall be kept of the quantity of hydraulic fluid added to the system and emptied from leakage collection containers and pans, shall not exceed 5 gal before removal, shall be covered, and shall not be permitted to overflow.
|
8/3/2021
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
3.10 - Hoistway construction
|
8.11.2.1.3(p)
|
|
|
The large hole in the back hoistway wall in the top of the hoistway shall be patched with approved solid material.
|
9/18/2020
|