MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.5 Code Data Plate
|
|
|
Provide a code data plate conforming to sec 8.9
|
12/6/2021
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Auxiliary power lowering is not working. Re-inspection required
|
4/23/2024
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1002.2g (Standby Power Operation)
|
x
|
|
Needs 2 wires from disconnect to controller. The 2 wires needed are from an auxilliary set of contacts in the disconnect, going to the plug on controller. This lets the controller know if the disconnect is powered down or that the electric is off. Re-inspection is required
|
|