Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.3.3.7 Phase 2 Operation Panel (Re-Inspection) x Phase II panel key must match the phase I recall key in lobby.
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.8 Switch Keys (Re-Inspection) x Change FFS switch keys to match. Phase 1 recall ok. 8/19/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.3.3.7 Phase 2 Operation Panel (Re-Inspection) x Phase 2 door panel key lock damaged, unable to open. 8/19/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.3.3.7 Phase 2 Operation Panel (Re-Inspection) x Keylock on Phase II panel door must match Phase I recall key. 10/11/2024