Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.3.3.7 Phase 2 Operation Panel (Re-Inspection) Yes No Phase 2 door panel key lock damaged, unable to open. Phase 1 recall ok. 8/19/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.8 Switch Keys (Re-Inspection) Yes No Change FFS switch keys so they match. 8/19/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.3.3.7 Phase 2 Operation Panel (Re-Inspection) Yes No Keylock on Phase II panel door must match Phase I recall key. 10/11/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.3.3.7 Phase 2 Operation Panel (Re-Inspection) Yes No Phase II panel key must match the phase I key in lobby. 4/21/2025