Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 8.6.11.1 Firefighters Emergency Operation: Monthly Testing A record of findings for firefighters' service operation, tested monthly as required by 8.6.11.1 with identification of the person(s) that performed the operation, and the date shall be available on-site. 2/9/2023
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.41 - Maintenance Records 8.6.1.4 All the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022) 8/12/2021
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 11 CSR 40-5.090 Inspection and Testing 8.11 Periodic Inspection and Test. x Annual inspection and category 5 test of overspeed valve had to be stopped due to fire service issue and elevator being red tagged. Complete annual inspection and category 5 testing of overspeed valve still needs to be completed. 1/31/2022
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 11 CSR 40-5.090 Inspection and Testing 8.11 Periodic Inspection and Test. x Annual inspection and category 5 test of overspeed valve had to be stopped due to fire service issue and elevator being red tagged. Complete annual inspection and category 5 testing of overspeed valve still needs to be completed. 3/7/2022
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 2.3 - Lighting and receptacles 8.11.2.1.2(c) Make all machine room lighting operational. 2/14/2019
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 2.27.2-2.27.8 x x Phase 1 fire service is operating erratically. Firemans' return shall be repaired and tested for compliance, including initiating devices and wiring. Elevator Red Tagged. 1/31/2022
MO Minimum : Elevators (C) - Car Enclosure: Freight (C)4 Repair car top panels to safely sustain load of 200 lbs. (front two panels have broken welds and mesh is damaged). 2/7/2024
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 5.1 - Pit access, lighting, stop switch, and condition 2.2.3 Guards Between Adjacent Pits The GFCI in the pit shall be operational. 7/13/2022
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 5.1 - Pit access, lighting, stop switch, and condition 2.2.5 Illumination of Pits The pit light shall be operational. 7/13/2022
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve in 2021 or 2022. The valve shall be sealed and tagged after the category 5 test. 8/12/2021
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators 6.4 - Firefighters' service (A17.1b-1989 and later editions) 8.11.2.2.6 Fire Fighters Operation (Re-Inspection) x When the elevator is in Phase 2 fire service operation with the phase 2 switch in the "HOLD" position, the elevator car shall remain at the landing. 2/2/2023