MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
OSV in pit is not sealed, provide testing per MFG. Leave written procedures on site. Tag and seal upon completion
|
8/26/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
x
|
|
Over speed valve not sealed or tagged. Must be cat 5 tested
|
1/11/2024
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Phase 1 switch broken, replace. Perform testing. Provide testing of phase 1 and 2 operation. Record results in MCP
|
8/26/2022
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.1 General Maintenance Requirements Documentation
|
|
|
Provide MCP
|
8/26/2022
|