A17.1-1996 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
106.1
|
|
|
Pit shall be kept clean. Remove excess debris.
|
5/25/2023
|
A17.1-1996 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
1206.7
|
|
|
The monthly fire service testing chart shall be maintained.
|
2/16/2023
|
A17.1-1996 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO state operating certificate shall be displayed in the elevator machine room.
|
2/16/2023
|
A17.1-1996 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
5/25/2023
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Required documentation and MCP shall be kept in equipment room including wiring diagrams, oil log, and fire service log recorded monthly. Log is not being filled out.
|
5/25/2023
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Provide a code compliant MCP including onsite documents.
|
1/19/2022
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. Evacuation procedures and maintenance charts are missing.
|
2/16/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
The fire service phase one key-switch bezel shall be legible.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
|
|
The fire service phase two key-switch bezel shall be legible.
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.3.1 Replacement Parts
|
|
|
Replace unreadable key switch bezels in car and hall.
|
5/25/2023
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This unit is equipped with an overspeed valve that is due for a category 5 test.
|
1/19/2022
|