MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A copy of the current state operating certificate shall be displayed in the machine room
|
3/15/2023
|
MO Minimum : Elevators
|
(C) - Car Enclosure: Freight
|
(C)5
|
|
|
C.5 - The cab ceiling is of the open type, which does not provide protection from the light bulbs should they shatter. The lights shall be guarded by plastic sleeve or some other means to properly protect passengers.
|
5/20/2019
|
MO Minimum : Elevators
|
(L) - Wire Ropes-Hoisting, Governor and Tiller
|
(L)12 (Re- Inspection)
|
|
|
The elevator governor rope is showing a high degree of wear and shall be replaced. Replace ropes within 90 days of inspection.
|
4/8/2019
|
MO Minimum : Elevators
|
(I) - Pits
|
(I)1
|
|
|
The elevator pit floor is covered in water. The elevator pit shall be kept clean and dry.
|
5/20/2019
|