|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1 - Door Systems 8.6.4.13 (Re-Inspection)
|
x
|
|
Door operator cover shall be installed. Re-inspection required
|
2/5/2024
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Emergency generator testing needs to be performed. Re-inspection required
|
2/5/2024
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
(G)1- 8.6.4.15 Car Emergency Systems (Emergency Light) (Re-Inspection)
|
x
|
|
Emergency light & alarm is not working. Re-inspection required
|
2/5/2024
|
|
A17.1-2016 : Elevators
|
6.5 -Acceptance Checklist for Firefighters' Service (ASME A17.1-2000 and CSA B44-00): Automatic Elevators
|
2.27.1
|
x
|
|
EO Phase I and II need to be tested when hall risers are installed
|
12/9/2025
|
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
2.2.4
|
x
|
|
Pit door shall be self closing and self locking.
|
12/9/2025
|
|
A17.1-2016 : Elevators
|
3.10 - Hoistway construction
|
2.1
|
x
|
|
Remove old/unsed deflector sheave from top of hoistway.
|
12/9/2025
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Written maintenance control program shall be provided on-site for each elevator.
|
12/19/2022
|