MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator has an overspeed valve device installed that is not sealed and is now required to have a 5 year full load test performed on or before the next annual inspection. This requirement is due to the State of Missouri adopting the A17.1 2016 version of the elevator safety code. Overspeed valve shall be tested on or before the next annual inspection.
|
3/24/2022
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4.1(a) On-Site Maintenance Records (MCP Records)
|
|
|
A copy of the MCP shall be kept in the machine room for each elevator
|
2/22/2022
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.1 General Maintenance Requirements Documentation
|
|
|
A written Maintenance Control Program (MCP) shall be in place to maintain the equipment in compliance with the requirements of 8.6.The MCP shall include but not limited to examinations, tests, cleaning, lubrication, and adjustments to applicable components at regular intervals.
|
3/24/2022
|