MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
There is a oil recovery unit installed in the pit of this elevator designed to return the oil leakage from the packing gland on the cylinder head. The State of Missouri has determined that this device does not suffice for oil leakage and is only allowed for temporary use until the packing gland can be repaired/replaced. Remove the recovery unit after the packing gland has been repaired/replaced and record the oil loss per A17.1 2016 - 8.6.5.5.7
|
5/4/2022
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.1 Examination and Maintenance
|
|
|
Seal on cylinder head is leaking excessively. Repack cylinder head.
|
11/8/2023
|
A17.1-2016 : Elevators
|
1.5 - Car lighting and receptacles
|
2.14.7
|
|
|
Ceiling panels in car are open egg crate type, providing no protection for passengers in event of bulb breakage. Panels should be replaced with solid type, plastic tubes & endcaps should be installed over bulbs or other means provided to protect passengers
|
12/14/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.5 - Car lighting and receptacles
|
2.14.7.1.3 Provide Auxiliary Lighting
|
x
|
|
Car emergency lights do not work.
|
10/17/2019
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
1.5 - Car lighting and receptacles
|
2.14.7.4 Protection of Light Bulbs and Tubes
|
|
|
The cab ceiling is of the open egg-crate type, which does not provide protection from the light bulbs should they shatter. The lights shall be guarded by plastic sleeve or some other means to properly protect passengers.
|
5/4/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator has an overspeed valve device installed that is not sealed and is now required to have a 5 year full load test performed. This requirement is due to the State of Missouri adopting the A17.1 2016 version of the elevator safety code. Reinspection in 90 days is required.
|
5/4/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.36 - Hydraulic Cylinders
|
8.6.5.5.2 Collection of Oil Leakage
|
|
|
Seal on cylinder head is leaking excessively, needs repacked
|
12/14/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.5 - Housekeeping
|
8.11.2.1.2(e) (Re-Inspection)
|
|
|
The elevator machine room cannot be used for storage. Remove the items being stored in the machine room to provide proper room for maintenance to be performed.
|
3/22/2022
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.6.4.7 Cleaning of Pits
|
|
|
The elevator pit shall be cleaned of oil and water.
|
5/4/2022
|
A17.1-2016 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
8.6.4.7 Cleaning of Pits
|
|
|
Pit needs to be cleaned of oil & water
|
12/14/2022
|