MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
Yes
|
No
|
Relief valve pressure testing shall be completed.
|
4/16/2025
|
|
A17.1-1996 : Elevators
|
3.10 - Hoistway construction
|
100
|
No
|
No
|
Need to seal all penetrative holes in hoistway
|
3/26/2026
|
|
A17.1-1996 : Elevators
|
5.1 - Pit access, lighting, stop switch, and condition
|
106.1
|
No
|
No
|
Means shall be provided to collect for removal any oil leakage from the cylinder packing gland
|
|
|
A17.1-1996 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
No
|
No
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
6/21/2023
|
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
No
|
No
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
6/19/2020
|