MO Minimum : Elevators
|
(L) - Wire Ropes-Hoisting, Governor and Tiller
|
(L)12 (Re- Inspection)
|
x
|
|
1 Hoist rope is rouged and undersized, all ropes shall be replaced within 120 days.
|
6/29/2022
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.2 On-Site Documentation
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room.
|
12/7/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
x
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. (This item is for notification purposes for future violation in 2022)
|
6/29/2022
|
A17.1-2016 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it.
|
12/7/2023
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.6.11.1 Firefighters’ Emergency Operation Documentation
|
|
|
A monthly record of findings for firefighters' service operation required by 8.6.11.1 with identification of the person(s) that performed the operation shall be available on-site.
|
12/7/2023
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.6.11.1 Monthly Test and Log
|
x
|
|
A record of findings for firefighters' service operation required by 8.6.11.1 with identification of the person(s) that performed the operation shall be available on-site.
|
6/29/2022
|
A17.1-2016 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
8.6.11.1 Firefighters’ Emergency Operation Documentation
|
|
|
A record of findings for firefighters' service operation required by 8.6.11.1 with identification of the person(s) that performed the operation shall be available on-site.
|
12/7/2023
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Emergency power operation of the elevator shall be tested.
|
5/24/2024
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Emergency power operation shall be tested.
|
8/31/2022
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
Emergency power operation shall be tested.
|
6/29/2022
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Emergency power operation shall be tested. Note: I have been advised that the existing transfer switch is not functional. A new transfer switch is on order and has an approximate 20 week lead time.
|
10/27/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.1 General Maintenance Requirements Documentation
|
|
|
Need maintenance control program on site posted on controller
|
10/27/2020
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.6.11.1 Monthly Test and Log
|
|
|
Provide monthly testing of Fire Service document on log in machine room
|
11/25/2019
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Standby emergency power operation shall be tested.
|
11/21/2023
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Test emergency power. Elevator did not work per code requirements.
|
3/17/2023
|
A17.1-2016 : Elevators
|
5.2 - Bottom clearance, runby, and minimum refuge space
|
8.6.4.11 Runby (Re-Inspect)
|
x
|
|
The hoist ropes have been replaced but they have stretched and the counterweight is compressing the buffer.
|
8/31/2022
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Up to date operating certificate required in the elevator machine room.
|
6/24/2024
|
A17.1-2016 : Elevators
|
2.27 - Rope fastenings
|
2.20.9
|
|
|
Wedge rope socket is anchored incorrectly. When the steel wire rope has been seated in the wedge socket by the load on the rope, the wedge shall be visible, and at least two wire-rope retaining clips shall be provided to attach the termination side to the load-carrying side of the rope. The first clip shall be placed a maximum of 4 times the rope diameter above the socket, and the second clip shall be located within 8 times the rope diameter above the first clip.
|
12/7/2023
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.2(d)(1)
|
|
|
Written evacuation procedures for elevators by authorized persons and emergency personnel shall be available on-site.
|
12/7/2023
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.2(d) On-Site Documentation (Written Procedures for Evacuation and Cleaning)
|
x
|
|
Written evacuation procedures for elevators by authorized persons and emergency personnel shall be available on-site.
|
6/29/2022
|
A17.1-2016 : Elevators
|
2.40 - Maintenance Records
|
8.6.1.2.2(d)(1)
|
|
|
Written evacuation procedures for elevators by authorized persons and emergency personnel shall be available on-site.
|
12/7/2023
|