Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
A17.1-2016 : Elevators 5.11 - Plunger and Cylinder 8.6.5.5 Jack drain tubes to be routed to a measurable containers in the pit. Currently routed directly into tank.
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements 8.6.1.4.1(a) On-Site Maintenance Records (MCP Records) Compliant/Required Documentation shall be kept in equipment room(neat/organized) including MCP, Wiring Diagrams, PM log, Callback log, Oil log, & Evacuation procedures. Fire service log to be recorded monthly. (Provided by Elev Co.) (All must be updated on every visit) - All documentation is missing.
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements 8.6.5.5.2 Oil Leakage Collection A written record shall be kept of the quantity of hydraulic fluid added to the system and emptied from leakage collection containers and pans, shall not exceed 5 gal before removal, shall be covered, and shall not be permitted to overflow. Note: Per the State of Missouri AHJ: "The use of oil recovery systems to return the hydraulic fluid back into the main reservoir by automatic means or by gravity feed prevents proper monitoring of the gland packing and seals", and "machine rooms cannot be used as containment areas.” 3/6/2023
MO Minimum : Elevators CSR 40-5.100 State Operating Certificate 5.100(2) Display of Operating Certificate A current MO State operating certificate shall be posted in the elevator equipment room, in a noncombustible frame with a clear protective vision plate over it. 3/6/2023