|
conversion
|
conversion
|
n/a
|
No
|
No
|
Cab Ceiling lights shall be guarded.
|
7/12/2021
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.2.1 Repair Parts
|
No
|
No
|
Repair or replace door open and close buttons inside he elevator.
|
2/28/2025
|
|
MO Minimum : Elevators
|
(B) - Car Enclosure: Passenger
|
(B)8 Car Lighting
|
No
|
No
|
Auxiliary lighting is inoperable and shall be repaired.
|
2/27/2025
|
|
A17.1-2016 : Elevators
|
1.5 - Car lighting and receptacles
|
2.14.7
|
No
|
No
|
Auxiliary light is inoperable
|
8/17/2026
|
|
MO Minimum : Elevators
|
(B) - Car Enclosure: Passenger
|
(B)8 Car Lighting
|
No
|
No
|
Replace ceiling tiles in car.
|
7/12/2021
|
|
A17.1-2016 : Elevators
|
1.5 - Car lighting and receptacles
|
2.14.7
|
No
|
No
|
The cab ceiling is of the open egg-crate type, which does not provide protection from the light bulbs should they shatter. The lights shall be guarded by plastic sleeve or some other means to properly protect passengers. It is missing a ceiling panel, ceiling needs to be repaired.
|
8/17/2026
|
|
A17.1-2016 : Elevators
|
1.5 - Car lighting and receptacles
|
2.14.7
|
No
|
No
|
Car lighting (ceiling) if fluorescent bulbs and egg crate ceiling tile. Either guard bulbs or replace egg crate. Or upgrade to LED.
|
8/18/2026
|
|
MO Minimum : Elevators
|
(B) - Car Enclosure: Passenger
|
(B)11 Phone or alarm not functioning ( Mandatory Re-Inspection due in 14 days)
|
Yes
|
No
|
Alarm bell inoperable and shall be repaired or replaced.
|
3/19/2025
|
|
conversion
|
conversion
|
conversion - reinspect
|
Yes
|
No
|
Need to test FEO Phase I
|
5/3/2018
|
|
A17.1-2016 : Elevators
|
1.6 - Car emergency signal
|
2.27.1 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
Yes
|
No
|
Emergency alarm inoperable. Re-inspection required
|
8/17/2026
|
|
conversion
|
conversion
|
conversion - reinspect
|
Yes
|
No
|
Emergency light, bell and phone shall work.
|
5/3/2018
|
|
conversion
|
conversion
|
conversion - reinspect
|
Yes
|
No
|
Car recalls during phase 1 operation ; however, light creen not bypassed and cab fire service buzzer inoperative, repair
|
7/25/2018
|
|
conversion
|
conversion
|
conversion - reinspect
|
Yes
|
No
|
Guarded cab lighting
|
7/25/2018
|