A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspection)
|
x
|
|
A category 5 test shall be performed on the overspeed valve.
|
9/2/2022
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Battery lowering shall be operational.
|
9/2/2022
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
211.2
|
x
|
|
Battery lowering shall be operational.
|
4/7/2023
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Evacuation procedures are missing from the MCP.
|
5/10/2023
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an over speed valve that in not sealed. A category 5 test shall be performed on the over speed valve in 2021 or 2022. The valve shall be sealed and tagged after the category 5 test.
|
5/10/2023
|
A17.1-1996 : Elevators
|
6.4 - Firefighters' service (A17.1b-1989 and later editions)
|
1206.7
|
|
|
Fire service testing must be documented monthly.
|
11/26/2024
|