Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 11 CSR 40-5.090 Inspection and Testing | 8.6.5.16.5 Over Speed Valve Testing | Perform OSV test on or before next annual inspection. | 8/12/2021 | ||
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators | 2.6 - Ventilation | 2.7.5.2 | Permanent means of temperature control are inoperable and shall be repaired in order to maintain machine room temperature. |