ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
Perform OSV test on or before next annual inspection.
|
8/12/2021
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.6 - Ventilation
|
2.7.5.2
|
|
|
Permanent means of temperature control are inoperable and shall be repaired in order to maintain machine room temperature. The temporary setup is not acceptable and is not permanent.
|
|
ASME A17.1 2004 with 2005 Addendum and 2005 : Elevators
|
2.6 - Ventilation
|
2.7.5.2
|
|
|
Permanent means of temperature control are inoperable and shall be repaired in order to maintain machine room temperature.
|
|