A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
A code compliant MCP and all the on-site documentation required by A17.1 2016 - 8.6.1.2.2 and 8.6.1.4 shall be provided in the machine room. Evacuation procedures are missing. (This item is for notification purposes for future violation in 2022)
|
10/8/2024
|
A17.1-1996 : Elevators
|
1.17 - Standby power operation
|
1001.2(a)(17)
|
x
|
|
Elevators that are equipped to operate on emergency power shall be tested with no load in the car while operating on the emergency generator.
|
12/7/2021
|
A17.1-1996 : Elevators
|
2.8 - Pipes, wiring, and ducts
|
1001.2(b)(8)
|
|
|
Pipes conveying liquid, gas or vapor that cross overhead of elevator equipment or come in close proximity of the equipment shall be guarded or guttered.
|
5/11/2020
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
This elevator is equipped with an over speed/rupture valve that is not sealed. A category 5 test shall be performed on this valve on or before the next annual inspection and the valve shall be sealed.
|
8/30/2021
|