                        conversion
                     | 
                    
                        conversion
                     | 
                    
                        n/a
                     | 
                    
                     | 
                    
                     | 
                    
                        Negative counterweight runby, repair. 
                     | 
                    
                        6/27/2018
                     | 
                
                
                    | 
                        MO Minimum : Elevators
                     | 
                    
                        (A) - Hoistways
                     | 
                    
                        (A)16
                     | 
                    
                     | 
                    
                     | 
                    
                        When sprinkler systems are present in the hoistway, means shall be provided to automatically disconnect the main line power supply to the affected elevator prior to the application of water.
                     | 
                    
                        
                     | 
                
                
                    | 
                        MO Minimum : Elevators
                     | 
                    
                        11 CSR 40-5.090 Inspection and Testing
                     | 
                    
                        (3) Testing Procedures (Re-Inspect)
                     | 
                    
                            x
                     | 
                    
                     | 
                    
                        Incomplete test, Fire service and emergency power shall be tested.
                     | 
                    
                        5/13/2025
                     | 
                
                
                    | 
                        MO Minimum : Elevators
                     | 
                    
                        11 CSR 40-5.090 Inspection and Testing
                     | 
                    
                        (3) Testing Procedures (Re-Inspect)
                     | 
                    
                            x
                     | 
                    
                     | 
                    
                        The emergency generator testing failed. The transfer switch failed to operate properly. Re-inspection required
                     | 
                    
                        
                     |