Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | 11 CSR 40-5.090 Inspection and Testing | (3) Testing Procedures (Re-Inspect) | x | Incomplete test, emergency power shall be tested. | ||
conversion | conversion | n/a | Negative counterweight runby. Repair. | 6/27/2018 | ||
MO Minimum : Elevators | (A) - Hoistways | (A)16 | When sprinkler systems are present in the hoistway, means shall be provided to automatically disconnect the main line power supply to the affected elevator prior to the application of water. |