MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing (Re-Inspect)
|
x
|
|
Full load over speed valve past due 30 day maximum to complete. this was written up last year. this can result in a red tag
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
x
|
|
Full load over speed valve test past due 90 day maximum to complete
|
4/15/2024
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.4 Maintenance records
|
|
|
Need a maintenance control program on site posted on controller by or on next test
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.2.2(b) On-Site Documentation (Procedures for Inspections and Tests)
|
|
|
Need testing procedures in the mcp on or before 1/1/22
|
|