A17.1-2016 : Elevators
|
5.15.2 Unsealed Overspeed Valve
|
8.6.5.16.5 (Re-Inspect)
|
x
|
|
OSV is not sealed as noted in the last inspection. Perform required testing, seal & tag within 90 days. Re-inspection required
|
9/27/2022
|
A17.1-2016 : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A copy of the current state operating certificate shall be displayed in the machine room
|
9/28/2022
|
A17.1-1996 : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
OSV is not sealed and needs full load test on or before next inspection.
|
9/28/2022
|
A17.1-1996 : Elevators
|
2.41 - Maintenance Records
|
8.6.1.4
|
|
|
Written maintenance control program shall be kept on site for each elevator.
|
9/28/2022
|