A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Battery lowering was tested and working, but mainline disconnect microswitch failed to operate.
|
7/6/2023
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Battery lowering was tested and working, but mainline disconnect microswitch failed to operate.
|
7/20/2023
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
(3) Testing Procedures (Re-Inspect)
|
x
|
|
"A" floor lobby smoke sends elevators to alternate floor, instead of primary recall.
|
7/20/2023
|
A17.1-2016 : Elevators
|
2.6 - Ventilation
|
2.7.9.2
|
x
|
|
Ventilation grill cover shall be reinstalled in the machine room.
|
7/6/2023
|