Code Item Section Reinspection Red Tag Reason For Violation Fixed Date
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements 8.6.1.4.1(a) On-Site Maintenance Records (MCP Records) A written Maintenance Control Program shall be in place to maintain the equipment in compliance with the requirements of Section 8.6
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements (G)1 - 8.6.4.15 Car Emg Sys (Phone or alarm not functioning Mandatory Re-Inspection due in 14 days) x Emergency Phone in car fails to establish two-way communication 4/28/2025
MO Minimum : Elevators (G) - Maintenance, Repair and Replacements (G)1 - 8.6.4.15 Car Emg Sys (Phone or alarm not functioning Mandatory Re-Inspection due in 14 days) x Emergency Phone in car fails to establish two-way communication
MO Minimum : Elevators (H) - Machine Rooms (H)4 Machine room floors shall be kept clean and free of grease and oil.
MO Minimum : Elevators (H) - Machine Rooms (H)4 Machine room floors shall be kept clean and free of grease and oil. Articles or materials not necessary for the maintenance or operation of the elevator shall not be stored therein.There is a saw dust like material piling up on the pit floor that needs to be swept up
MO Minimum : Elevators 11 CSR 40-5.090 Inspection and Testing 8.6.5.16.5 Over Speed Valve Testing Overspeed valves, where provided, shall be inspected and tested to verify that they will stop the car, traveling down with rated load every 5 years.
conversion conversion n/a pit in need of house keeping 2/20/2019