|
MO Minimum : Elevators
|
(A) - Hoistways
|
(A)16
|
No
|
No
|
Pit light switch needs cover plate
|
6/12/2023
|
|
MO Minimum : Elevators
|
(H) - Machine Rooms
|
(H)2
|
No
|
No
|
Machine room door must be self-locking
|
6/12/2023
|
|
MO Minimum : Elevators
|
(S) - Fire Service
|
8.11.2.2.6 Firefighters’ Emergency Operation (Re-Inspection)
|
Yes
|
No
|
Phase 2 key switch not working
|
8/24/2022
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.1.6.7 Signs and Data Plates
|
No
|
No
|
In case of fire don't use elevator signage needed
|
8/24/2022
|