MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Oil leakage shall be monitored. Gravity line back to tank shall be put in 5 gallon container in elevator pit.
|
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
A copy of the current operating certificate shall be displayed in the machine room
|
|
MO Minimum : Elevators
|
(G) - Maintenance, Repair and Replacements
|
8.6.5.5.2 Oil Leakage Collection
|
|
|
Plastic oil line from right jack shall be removed from tank and put into 5 gallon bucket in pit to allow monitoring of oil leakage
|
|
MO Minimum : Elevators
|
CSR 40-5.100 State Operating Certificate
|
5.100(2) Display of Operating Certificate
|
|
|
Post current State Elevator Certificate.
|
|
MO Minimum : Elevators
|
11 CSR 40-5.090 Inspection and Testing
|
8.6.5.16.5 Over Speed Valve Testing
|
|
|
OSV is not sealed. Perform OSV test on or before next annual inspection date.
|
3/31/2022
|
MO Minimum : Elevators
|
(B) - Car Enclosure: Passenger
|
(B)11 Phone or alarm not functioning (Mandatory Re-Inspection due in 14 days)
|
x
|
|
Emergency light and bell do not work on 110v emergency power. The alarm bell is inoperable on normal as well. Repair or replace
|
2/28/2023
|
A17.1-2016 : Elevators
|
1.17 - Standby power operation
|
8.6.4.19.7 (Re-Inspection)
|
x
|
|
Emergency lowering system shall be made operational. Re-inspection required
|
2/28/2025
|