Code | Item | Section | Reinspection | Red Tag | Reason For Violation | Fixed Date |
---|---|---|---|---|---|---|
MO Minimum : Elevators | (L) - Wire Ropes-Hoisting, Governor and Tiller | (L)12 (Re- Inspection) | x | The elevator hoisting ropes are showing a high degree of wear and shall be replaced. Replace ropes within 90 days of inspection. Alteration permit and reinspection required. | 2/26/2025 |